国产成人久久精品二区三区1,免费人成视频,一区二区三区四区高清无码,免费无码又爽又黄又刺激网站91

EN
The flue gas cleaning (FGC) project undertaken by Huaxing East for Anping waste incineration power plant in Hengshui, Heibei Province started construction
2023.01.14
The FGC project undertaken by Huaxing for Anping Waste-to-Energy plant in  Hengshui, Heibei Province  was commenced on July 01, 2020.
The plant has an average waste treatment capacity of 800 t/d, construction of 2x400t/d mechanical grate waste incineration production line, equipped with 1x18 MV steam turbine generator. The FGC process applied "in-furnace SNCR + semi-dry rotary spray + Sodium hydroxide solution injection system + dry method with dry powder injection + activated carbon adsorption + bag filter + wet reserved + SCR reserved + fly ash conveying, storage and stabilization process". It is an EPC project of Huaxing.
The achievements of Huaxing East in Hebei Province include Baoding phase I & II, Hengshui, Anping, Dingzhou, Cangzhou phase I, Shijiazhuang, Caofeidian, Weichang, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Sanhe, Xianghe, Luanzhou, Shahe, Xia Nenxin of Shijiazhuang, etc.
For more information, please click or scan below!

Follow us!